Please search for the property address for the application. If the property address is not found please enter it manually in the fields below
Please search for the property owner for the application. If the property owner is not found please enter the information manually in the fields below.
Please search for the general contractor for the application. If the general contractor is not found please enter the information manually in the fields below.
Note: THE PERMIT EXPIRES THIRTY (30) DAYS FROM THE DATE OF ISSUANCE. AN OWNER DESIRING TO CONTINUE TO BOARD HIS/HER PROPERTY BEYOND THE 30 DAY TERM, MUST SUBMIT A RENEWAL APPLICATION. A NEW PERMIT MUST BE OBTAINED IF THE ORIGINAL PERMIT IS NOT RENEWED WITHIN 5 DAYS OF THE EXPIRATION OF THE ORIGINAL PERMIT.
ALL BOARDED OPENINGS SHALL BE PAINTED WITH A MINIMUM OF TWO (2) COATS OF EXTERIOR PAINT, WHICH SHALL BE OF COLOR COMPATIBLE WITH THE EXTERIOR COLOR OF THE BUILDING OR STRUCTURE.