Green Township Right of Way Permit

NOTICE TO PERMIT HOLDERS

Cost $50.00

No Cost for Utility Permits

Please call 513-574-8832 to pay with Credit Card

The following basic procedures and specifications are to be followed to meet the requirements of your permit:

DRIVEWAY APRON PERMITS:

Driveway Apron Section (Depth): All apron improvements within the Township Public Right of Way (R.O.W.) shall be seven (7") inches in depth minimum for concrete, ten (10") inches for asphalt.

Material Specifications: Concrete shall be Class C (4000 or 4500 Type) full depth seven (7") inches with no reinforcement steel. Expansion joint material is to be placed adjacent to curbs and walks. Asphalt shall be 7" +/- of compacted B-19 stone base topped with 3" of ODOT 404 Asphalt.

Inspection Requirements: There are 2 inspections required to satisfactorily complete the Inspection Requirements. The Assistant Director of Public Services can be reached at 513-574-8832.

1st Inspection/Form Inspection - Once the existing driveway apron has been removed or soil has been removed to a uniform depth as required by the above and applicable forms are in place.

2nd Inspection/Final Inspection - Final inspection is to occur only after forms have been stripped, the apron has been backfilled and all disturbed soil has been seeded, mulched and/or sodded prior to inspection.

Culvert Pipe: If a culvert pipe is required for the free flow of water within the right-of-way, the minimum diameter shall be twelve (12") inches. The pipe shall meet Hamilton County standards for ROW culvert pipes as to location and specified type.

New Subdivisions: Hamilton County Subdivision Standards for Driveway Aprons are to be followed including standards for location, configuration, slope, and sidewalk placement.

PIPE INSTALLATION/OPEN PAVEMENT:

Material Specifications: We require a 3" scheduled 40 pipe. If you use a larger pipe, then you have to reduce this pipe to fit our 3" size pipe.

Inspection Requirements:

The first inspection is after the curb cut is made.

The final inspection is before the pipe is covered.

NOTE: 24-HOUR NOTICE IS REQUIRED FOR ALL INSPECTIONS

If the permit holder does not call for a final inspection within one (1) year of obtaining the permit, the permit will be nullified and a new permit will have to be secured.

* Information is required.

Contact Information

* First Name:
* Last Name:
Business Name:
Email:
* Daytime Phone: (
Address:
City:
State:
ZIP:

Location

Please select the closest street number/streetname of problem location from list or select "*not on list". Provide any additional information on problem location in the box below.

* Address
   
- Or Other Not Listed -

Invalid Address

The address you entered does not match any in the system. You can select a valid address from the list, or if you are certain the address you entered is correct click the "Use the address I entered" button, to continue.

The address you entered
 
Unit: 
  Provide any additional information on problem location in the box below.

* Check one for requested permit




5
 
* Type pf property:




 
* Surface:



4
 
Contractor Information

Name, Street Address, City, State, Zip, Phone

 
* Electronic Signature
 

CAPTCHA

Check here to have email confirmation of this submission.

* Information is required.

I hereby agree to all terms, conditions, and restrictions written or printed below, and/or attached, including the precautions for the protection of the public and all utilities within the public right-of-way and to any and all installations in said area. If work done under this permit involves or endangers structures belonging to others, I shall immediately notify the owner.

This permit may at any time be revoked or annulled by the Green Township Assistant Road Superintendent for non-performance and/or non-compliance with any of the conditions, restrictions, and or regulations. Violations of or non-compliance with said regulations are subject to penalties provided by Sections 5571.16 and 5571.99 of the Ohio Revised Code.

At all times during the progress of the work, the permit holder shall provide adequate protection and passage for the traveling public.

Plans and/or applications must be approved and permit secured before commencing work. For inspections, contact Butch Nanney at 574-8832, weekdays between 7:30 a.m. and 3:00 p.m.

Internal Use Only, Leave Blank:
Please leave this field blank and remove any values that have been populated for it.

Township Home | E-Gov Home | Action Line | Online Documents | Subscriptions | Job Postings
Bid Postings
Login | Register | Privacy Policy
Copyright ©2004-2025 Munission LLC.