The City of Georgetown, SC requests sealed bids from qualified contractors to work on our Cherry Street Water Improvement Project. The scope of work is highlighted on the construction plans prepared by Stantec Engineers and in general includes: mobilization, abandon and removal of existing 2-in. water main, erosion control, traffic control, install 6-in. PVC C-900 water main and appurtenances, directional bore for 6-in. HDPE water main, directional bore for new water services, sterilization and testing of newly installed water main, and asphalt restoration. For more information, please see the links below in Download Available.